— Free & Confidential Diagnostic Audit
Retroactive Permitting & Expediting
The Work Is Already Done. We Make It Legal.
ATX
Austin Metro
5–10 business days to permit path
Diagnostic Response
Flat Fee
Scoped After Diagnostic
3
Frameworks Aligned
Request Your Diagnostic Audit
Tell us what you are dealing with. We map your exposure and respond with the resolution path — free, confidential, no obligation.
Prefer to talk now? Call (737) 510-6116
— Municipal Code & Property Resolution Services
Complete support for every retroactive permits requirement
Complete permit-history audit and unpermitted-scope assessment
Retroactive permit strategy sequenced to minimize penalties and open-wall inspections
As-built documentation and permit application preparation
Coordination with plan reviewers, inspectors, and building officials
Stop-work order resolution and job-site restart management
Correction coordination when work does not meet current code
Permit finalization and certificate documentation for title, lending, and insurance
Violation closure tied to permit issuance — one integrated file
— How It Works
Municipal Code & Property Resolution is complex. We make it simple.
Diagnostic Audit
We pull the property's permit history, assess the unpermitted scope, and determine exactly what the building department will require — as-builts, engineering letters, exposed inspections, or corrections. You get the complete path and cost map before anything is filed.
Package & File
We prepare the retroactive permit application: as-built documentation, required engineering coordination, and the filing sequence designed to minimize open-wall requirements and penalty exposure.
Inspect & Close
We schedule and manage the inspections, coordinate any required corrections, push the permit to final issuance, and close the associated violation or stop-work order with documented confirmation.
The Problem
The renovation finished two years ago. Nobody pulled a permit. Now the city knows — a neighbor complained, a sale triggered a records check, or an inspector drove by. Or worse: the red tag is already on the door and every trade on your site is standing still while daily fines accrue. Unpermitted work poisons everything it touches: the appraisal comes in low, the buyer's lender refuses to close, the insurance carrier denies the claim because the work was never inspected, and the city can require you to open walls or tear out finished work just to prove what is behind the drywall.
Red TagFull site shutdown under stop-work
The Resolution
We build the retroactive permit strategy: what can be permitted as-built, what needs engineered documentation, what needs targeted exposure for inspection, and in what sequence to file so the city works with the project instead of against it. We prepare the as-built drawings and permit applications, coordinate with plan reviewers and inspectors, and drive the package to issuance — then close out the violation and lift the stop-work order.
— Free — No Obligation
Unpermitted work poisons sales, insurance claims, and financing — and stop-work orders burn carrying costs daily.
Real specialists. No bots. No shortcuts. Request your diagnostic and we respond with a scoped, flat-fee resolution path.